Manteca, California Zoning Map
Zoning, overlays and hazards on every parcel — and an answer to what the code actually lets you build. Compiled from current zoning data for all 19 districts.
Prefer to browse? Open the full Manteca map ↗
What's in the Manteca dataset
Every field below is available for any Manteca parcel, on the map and through the AI.
Zoning
- District code & full name
- Category & ordinance article
- Parcel boundary & APN
- All 19 districts mapped
Use classes, resolved
- Read per zoning district
Building controls
- Maximum building height
- Floor area ratio (FAR)
- Front setback
- Side setback
Overlays, hazards & AI
- Flood hazard & environmental layers
- Ask the AI about any parcel
- Powered by live parcel data
Where uses are permitted in Manteca
Share of Manteca's zoned land where each use is permitted.
- Single-family
- 52.42%
- Multi-family
- 10.86%
- ADU
- 57.56%
- Two-family
- 5.72%
- Retail
- 15.94%
- Eating & drinking
- 12.88%
- Office
- 16.48%
- Hotel / motel
- 13.20%
- Industrial
- 3.61%
- Storage & warehouses
- 11.34%
Manteca, California Zoning Districts: What Do They Mean?
Zoning districts are areas regulated by specific laws that determine land use, building types, and development rules. Each district below shows its zone type and which uses it permits.
| Zone Code | Category | Permitted Uses | Area | Details |
|---|---|---|---|---|
AG Agricultural | Agriculture | - | 119.6 ac | Standards & uses → |
BIP Business Industrial Park | Mixed |
| 75.2 ac | Standards & uses → |
BP Business Park | Commercial |
| 20.4 ac | Standards & uses → |
CG General Commercial | Commercial |
| 836 ac | Standards & uses → |
Showing 4 of 19 districts
Start from what you're trying to build
Each one runs against the live Manteca dataset and returns the districts, standards and approvals involved.
Where can I build multifamily in Manteca?
3 of 19 districts permit multifamily - by right, conditionally, or by variance.
Run it →Which sites allow a warehouse?
2 industrial districts (M1, M2) with height and access limits.
Run it →Are ADUs allowed in Manteca?
Allowed statewide under California law, subject to local development standards.
Run it →What does AG actually permit?
The full standards for one district, read straight from the source.
Run it →What should developers know about Manteca zoning?
Manteca is a fast-growing San Joaquin Valley city whose zoning map is dominated by master-planned and greenfield expansion land rather than a fixed urban core. The largest single district is R1 (One Family Dwelling) at over 6,200 acres, but it is the planning-oriented districts - Planned Development (PD) at roughly 1,356 acres, Master Planned (MP) at over 1,030 acres, plus the Union Ranch Specific Plan (SP) - that define the city's growth trajectory. For developers, that mix means a large share of buildable land is entitled or earmarked through specific-plan and planned-development frameworks, where standards are negotiated at the plan level rather than read straight off a base district.
The residential ladder is conventional and legible: R1 for detached homes, RE (Residential Estate) for larger lots, and R2 and R3 (Limited Multiple Family and Multiple Family Dwelling) for attached and apartment product. Commercial and employment land is substantial - General Commercial (CG) covers more than 800 acres and the two mixed-use districts, Commercial Mixed Use (CMU) and Downtown Mixed Use (DMU), together signal an intent to layer housing onto retail corridors and the downtown. Industrial capacity is real, split across Light Industrial (M1), Heavy Industrial (M2), Business Park (BP) and Business Industrial Park (BIP).
A meaningful base of land sits in Agricultural (AG), Open Space (OS), Park (P) and Public/Quasi-Public (PQP) categories, consistent with a city still converting farmland at its edges. Building controls cover FAR, lot, density, coverage, pervious-surface, lot-width, height and full setback standards, but the most consequential entitlement decisions for large sites will happen inside the PD, MP and specific-plan processes. This is pre-development intelligence, not legal advice - verify with the local planning department before acquisition.
Manteca zoning: frequently asked questions
What kinds of housing can be built across Manteca's residential districts?
Detached single-family homes belong in R1 (the city's largest district by far) and on larger parcels in RE (Residential Estate). Attached and multifamily product is accommodated in R2 (Limited Multiple Family Dwelling) and R3 (Multiple Family Dwelling). For larger or mixed programs, the Planned Development (PD) and Master Planned (MP) districts and the Union Ranch Specific Plan set their own negotiated standards.
How important are specific plans and planned development to Manteca's growth?
They are central. Between Planned Development (PD), Master Planned (MP) and the Union Ranch Specific Plan (SP), well over 2,000 acres of the city's buildable land is governed by plan-level frameworks rather than off-the-shelf base zoning. Developers acquiring in these areas should expect standards, phasing and infrastructure obligations to be set in the adopted plan documents.
Where does Manteca concentrate mixed-use and downtown development?
Two mixed-use districts carry the city's main intent to blend housing with commercial: Commercial Mixed Use (CMU), at roughly 485 acres, and Downtown Mixed Use (DMU), at about 223 acres. These are the natural targets for vertical or horizontal mixed-use product and for downtown infill, as distinct from the auto-oriented General Commercial (CG) corridor.
What industrial options exist for employment and logistics uses?
Manteca offers a graduated industrial menu: Light Industrial (M1) and Heavy Industrial (M2) for manufacturing and processing, plus Business Park (BP) and Business Industrial Park (BIP) for lighter, campus-style employment. Given the city's Highway 99/120 position in the Northern San Joaquin Valley, the M-series and BIP land is relevant to logistics and distribution underwriting.
How much of Manteca is held in agricultural and open-space categories?
A substantial share - Agricultural (AG), Open Space (OS), Park (P) and Public/Quasi-Public (PQP) together account for a large footprint, reflecting a city still annexing and converting farmland at its periphery. Buyers targeting these edges should plan around conversion timing, infrastructure extension and the surrounding specific-plan and planned-development context.
California zoning maps
Analyze any Manteca parcel in 60 seconds
Zoning, overlays, hazards, and what the code actually allows - in one place.
Zoning data is pre-development intelligence, not legal advice. Verify with the Manteca planning department before acquisition or design.