Request a demo and Enjoy a Free Trial
For Land Acquisition Managers

Stop screening parcels one by one. Find development sites 50× faster.

The U.S. has 30,000+ local zoning jurisdictions. ArchiWise gives your acquisition team AI analyst capacity on day one - screen the whole market, not just what's listed.

  • Full zoning, hazard & feasibility intelligence on every parcel
  • Screen listed and off-market sites - 50x faster than manual
  • Know the fatal constraints before you call the broker
app.archiwise.ai - Los Angeles submarket

Qualifying parcels · 247 results

Screened in 38 min

4721 S Vermont Ave

Med risk
C2-1VL-CPIO47 units maxCPIO overlay

1382 W Adams Blvd

Low risk
R4-162 units maxNo overlays

8200 S Figueroa St

High risk
MR1-131 units maxFlood zone

244 more parcels · sorted by density headroom

50×

faster screening

30,000+

jurisdictions covered

Built for the Person Who Owns the Pipeline

You're under pressure to bring more qualified deals to committee with less guesswork. ArchiWise gives you the analyst capacity you've never been able to hire.

Mid-size & institutional developers

Multifamily, mixed-use, BTR, and infill specialists running active acquisition programs.

High-volume sourcing teams

Cold outreach, broker channels, and off-market hunts - where speed and accuracy both matter.

Capital-discipline organizations

Where every LOI must hold up to investment committee scrutiny and bad assumptions are expensive.

Where Acquisition Pipelines Break Down

Three patterns we see in every sourcing team that hasn't modernized.

3–5 sites screened per week. Your competitor is doing 50.

Manual research doesn't scale across 30,000+ zoning jurisdictions. By the time diligence finishes on your shortlist, the seller has signed with someone who moved faster.

The overlay your title company missed.

Flood zones, historic districts, CPIO design review, methane zones - hidden constraints that surface in week six, after legal fees, consultant retainers, and carrying costs are already sunk.

LOIs built on incomplete zoning assumptions.

If your massing assumes by-right density but the parcel sits in a discretionary trigger zone, the offer won't hold. Renegotiation damages broker relationships and costs credibility with sellers.

The True Cost of Late Discovery

Most fatal constraints exist from day one. The only question is when you find them - and how much you've already spent.

Day 1Week 1Week 3Week 6Post-closeLOI signed /point of no returnArchiWise pathFlag caught at screening - $0 sunkpivot immediatelyconstraint existed all alongTraditional researchOverlay found - week 6Legal · consultant · redesign$100K – $380K sunk

What You Get with ArchiWise

Six capabilities a senior acquisitions team needs - on day one, without hiring.

Market screening at scale

Screen entire submarkets - listed and off-market. Filter by zoning classification, lot size, current FAR utilization, ownership patterns, and density headroom. Listed properties are less than 5% of viable sites.

Learn more
Instant zoning & feasibility

Get max buildable units, GFA, height limits, setbacks, parking requirements, and density bonus eligibility the moment you click a parcel. Test scenarios before you call the broker.

Learn more
Hazard & overlay flags

Flood zones, seismic risk, fire hazard severity zones, methane zones, historic overlays, and CPIO districts - surfaced on day one from FEMA, USGS, and local planning data. Not on day 45.

Learn more
Entitlement viability

Beyond what's permitted - ArchiWise tells you what's likely to get approved. Discretionary triggers, design review requirements, and entitlement pathway analysis before you commit capital.

Learn more
Area intelligence (50+ sources)

Demographics, utility capacity, planned transit projects, off-site improvement requirements, and market comps - pulled from USGS, FEMA, EPA, Census Bureau, CoStar, and local planning departments.

Learn more
Underwriting-ready outputs

Export site briefs with zoning summary, hazard flags, program assumptions, and comps. Hand directly to your investment committee. No reformatting required.

Learn more

From Buy Box to LOI in Four Steps

The acquisition workflow, reimagined.

01

Define your buy box

~30 min

Set zoning classifications, target density, lot size range, and submarket criteria once. Reuse across every sourcing cycle. The platform remembers your parameters.

02

Screen the whole market

< 1 hour

Surface hundreds of qualifying parcels with zoning headroom and underbuilt FAR. Includes off-market parcels - not just listed inventory.

03

Pre-qualify with AI

Minutes per parcel

Run zoning translation, hazard checks, entitlement viability, and a quick massing on your shortlist. Know the fatal constraints before outreach.

04

Issue a confident LOI

Days, not weeks

Underwrite with complete information. Move from first look to LOI faster than your competitors finish their first consultant call.

The Impact on Your Pipeline

10×

More parcels screened per analyst per week

vs. 3–5 sites with manual research

Faster preliminary underwriting - same team, more pipeline

CBRE Tech Adoption Report, 2025

$380K

Avoided in a single deal - one overlay flag caught before close

ArchiWise customer case, 2025

35%

Reduction in early-stage due diligence costs for large portfolios

Goldman Sachs estimates, 2025

See What You Know Before You Call the Broker

Every parcel. Instant intelligence.

4721 S Vermont Ave, Los Angeles, CA 90037

APN 6024-011-008 · 9,800 sq ft · C2-1VL-CPIO

BuildableCPIO overlayLow seismicNo flood zone
[ Parcel map ]

Max buildable units

47

Based on FAR 3.0 + density bonus

Gross floor area

29,400 sf

At max FAR (3.0)

Current FAR utilization

0.4×

7.5× headroom remaining

Entitlement risk

Medium

CPIO design review required

Zoning Summary

Height limit45 ft / 4 stories
Required parking0.5 per unit (TOC Tier 2)
Ground floor retailNot required
Density bonus eligibilityYes - 50% bonus (SB 9)
ADU allowedYes, up to 2

Risk Flags

CPIO design reviewNo historic overlayNo methane zoneNo liquefaction riskNo fire hazard severity zone
“ArchiWise flagged an overlay zone restriction that our title company and attorney both missed. Catching it early saved us from roughly $380K in redesign costs and six months of lost time. We were able to adjust immediately instead of discovering it after close.”
Joe Park

Joe Park

Director of Land Acquisition

Mid-size Multifamily Developer, Los Angeles

Bring Every Deal to Committee with Confidence

See how ArchiWise plugs into your sourcing workflow in a 30-minute demo.